What Are The Precautions For Installing Molded Case Circuit Breaker Wiring?

Feb 21, 2024

Leave a message

https://www.kaichuanpower.com/breaker/

Here are 3 points for you:

1. General circuit equipment, there are power supply and load signs on it, in the actual wiring process, just follow the above signs, do not reverse the two.

2. The control switch or protection wire shall not pass through the current transformer, and when the three-phase five-wire system or single-phase three-wire system is adopted, the protection wire must be connected to the protection trunk at the inlet end of the leakage circuit breaker. In the case of single-phase lighting circuits, three-phase four-wire distribution lines, and other lines or equipment that use a working neutral line, the neutral line must pass through the current transformer.

3. In the system where the transformer neutral point is directly grounded, once the leakage circuit breaker is installed, the working zero line can only be used as the working zero line after passing through the current transformer, and cannot be repeatedly grounded, nor can it be connected to the working zero line of other lines. The electrical equipment can only be connected to the load side of the leakage circuit breaker, and one end is not allowed to be connected to the load side and the other end to the power supply side

       Summary: Therefore, when professionals wiring, the first thing to ensure is that the circuit breaker is turned off, and at the same time, the correct power phase needs to be connected. Before wiring, it is also necessary to check whether the insulation of the wire is intact and whether the wiring is firm and reliable. The rated current and rated voltage of the molded case circuit breaker should meet the actual power demand, and the power supply needs to be cut off before operation when you want to disassemble the wiring.

Send Inquiry